전문 건설업 재해분석과 위험도 산정방안

원문정보

Formulation for Producing Risk Level of Each Construction Work

손기상, 갈원모, 최재남

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

Risk level for each construction work can be very important factors to establish advanced preventionmeasures. But it is important how to produce it. There are three different methods to set it up for consturuction situation. They are as follows; 1) occurrence frequency = the number of accident workers of each work kind / yearly accident workers 2) occurrence frequency = the number of accident workers of each work kind / yearly workers 3) occurrence frequency = the number of accident workers of each work kind / the total workers All these three concepts(=averaged concept)are analyzed. Additionally frequency based on discrete curve, and severity based on continuous curve are also combined for producing risk level with more scientific approach. This risk level can be very useful to make prevention plan or take measures at construction sites. This is study result can change existing risk level concept to new concept of it, namely rail way work and in-water work showed be high risk level and RC work be low risk level, different from the situation which we have thought commonly, so far.

목차

Abstract
 1. 서론
 2. 업종별 위험도 산정
  2.1 1차 위험도 산정
  2.2 2차 위험도 산정
  2.3 3차 위험도 산정
 3. 위험도 산정
  3.1 평균개념 위험도
 4. 분석
 5. 결론
 6. 참고문헌

저자정보

  • 손기상 Ki-Sang SON. 서울산업대학교 안전공학과
  • 갈원모 Won-Mo GAL. 을지대학교 보건환경안전학과
  • 최재남 Jea-Nam CHOI. 서울산업대학교 에너지환경대학원