Production schedule and realization quantity of Large type bus [929(HD), 928, 928-A(SD), 937E/L, 937/L,] were analyzed in order to intruoduce FMS(Flexible Manufacturing System) appropriate for varities of customer desire and multi-item, small lot production. And this paper is aimed to propose introduction method of FMS, analyzing zig tools change times and idle times with production line and workers as an object. According to analysis results, only simple spec., depending on bus type, changed with decrease in production. For 929(HD), 928,928-A(SD), 937Eh, 937/L bus type, there was no harmony between schdule and realization. Therefore, it caused many difficulties in part supply. And there was loss of manpower and reduction of productibility due to idle time of process with bus type change. Production processes were operated inefficiently because tact time exceeded or shortaged of allow time.
목차
1. 서론
1.1 연구의 배경
1.2 연구의 목적
1.3 연구의 방법 및 범위
2. 생산시스템 분석
2.1 생산공정
2.2 생산일정계획
3. 차종별 생산시스템 분석
3.1 차종별 생산실적 및 계획분석
3.2 차종별 Jig 공구교체시간
4. 생산공정의 작업분담 균형화
4.1 공정작업분담 분석
5. 결론
참고문헌