earticle

논문검색

시스템 개선에 의한 생산성 향상 효과 분석

원문정보

An Effect Analysis for Productivity Elevation by the System Improvement

김대식

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

The goal of this study is to analyze an effect of productivity elevation. For the goal, the various methods of the productivity elevation were suggested and the system improvements were conducted. The S company was established in Ban-Wol Industrial Complex, Ansan-City, Kyonggi-Do on 2007. The company was hiring 22 employees. The main manufactures were heavy duty equipment parts and the amount of sale was two billion won on 2008. Problems which the company faced were ambiguous production target management and materials loss. To solve the problems, NCT work improvement and automatic welding were induced. There were steel saving of 3,780,000won/month and man-hour saving of 144,000won/month by redesign of the steel sheet for the NCT steel job. Also, changing from handwork to automatic welding, the man-hour saving for the welding job was 320M/H and saving of 4,225,600won/month. The others of systematic improvement for productivity elevation were usage of jig and daily equipment checklist.

목차

Abstract
 1. 서론
 2. 경쟁력 향상
  2.1 생산성 향상
  2.2 원가절감
  2.3 3정5S
  2.4 산업용 로봇
  2.5 V.E.(Value Engineering)
  2.6 loss 제거
 3. 현황파악
  3.1 SWOT분석
  3.2 특성요인도
  3.3 문제점 및 개선대책
 4. 개선테마등록서
  4.1 NCT 작업
  4.2 용접작업
 5. 개선결과
  5.1 공정개선
  5.2 현장개선
  5.3 시스템 개선
 6. 경제적 효과
  6.1 로봇작업
  6.2 NCT 철판작업
 7. 결론
 8. 참고문헌

저자정보

  • 김대식 Dae-Sig Kim. 안산공과대학 산업경영과

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,200원

      0개의 논문이 장바구니에 담겼습니다.