earticle

논문검색

응용논문

전선 제조공정의 동(銅) 재료비 개선을 위한 6시그마 프로젝트

원문정보

A six sigma Project for Reducing the Cost Copper Materials of the Cable Manufacturing Process

배영주

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

This paper considers a six sigma project for reducing the cost copper of the cable materials in a electric wire company. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variables are selected by using an input variable evaluation table: large cable, plating, and a twisted pair. DOE is utilized for finding the optimal process conditions of the three key process input variables. The implementing result of this six sigma project is enable for reducing of the 2.8% copper materials.

목차

Abstract
 1. 서론
 2. 정의 단계
  2.1 비즈니스 케이스
  2.2 과제 목표와 문제기술
  2.3 프로세스 매핑
 3. 측정단계(Measure)
  3.1 현수준 측정 및 목표 설정
  3.2 Indicator 도출
 4. 분석단계(Analyze)
  4.1 잠재 요인 도출
  4.2 근본 원인 검증
 5. 개선단계
  5.1 개선안 도출 및 실행
  5.2 효과분석
 6. 관리단계(Control)
 7. 결론
 8. 참고문헌

저자정보

  • 배영주 Young Ju Bae. 충주대학교 산업경영공학과

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.