earticle

논문검색

Optimal Number of Failures before Group Replacement under Minimal Repair

원문정보

유영관

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

목차

Abstract
 1. Introduction
 2. Expected Cost Rate under the Policy
 3. Obtaining the Optimum Decision Variables
 4. Numerical Examples
 5. References

저자정보

  • 유영관 Young Kwan, Yoo. School of Business Administration, Halla University

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.