원문정보
초록
영어
The development of Geum river basin rainfall runoff model aims to secure technologies to forecast water demand and supply in real‐time or for a short period of time (within 10 days), thus efficiently using limited water resources. To this end, developed were platform technologies such as continuous channel runoff amount forecasting technology for ensuring mid‐ and long‐term channel runoff amounts in connection with weather forecasting information, and real‐time water balance analytic technology for optimizing the water distribution and supply in basins. This paper describes theoretical background and input/output statements of the RRFS (Rainfall‐Runoff Forecasting System) base model, SSARR (Streamflow Synthesis and Reservoir Regulation), and then overall simulation system of RRFS.
목차
Introduction
RRFS Model Description
Hydrological Models
SSARR Model
RRFS Program Usage
Procedures
RRFS Input Data Setup
RRFS Results
References