노무관리분석을 통한 TACT 협업체계 개선방안

원문정보

The Improvement of Collaborative System on the TACT Management by analysis the Labor Management

김법수, 박준모, 강유미, 최병주

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

Existing domestic construction markets are compoundly tied with the matter of interests and system about the control of the progress. compare to USA, periods of the finalization of the construction work in domestic markets take about 30% more. So the new way to reduce that period except Bar Chart and CPM process management is needed, and TACT process management is invite to the finalization of the construction work of public residence. this research compares the existing Bar Chart and CPM process management and lately invited TACT process management. And also by analyzing the production elements problem shows us the solution.

목차

Abstract
 1. 서론
  1.1 연구 목적 및 배경
  1.2 연구 범위 및 방법
 2. 공정관리 기법의 이론적 고찰
  2.1 공정관리의 정의
  2.2 공정관리 기법의 종류
 3. 공정관리기법 분석
  3.1 TACT와 기존 공정관리 기법 비교
 4. 노무관리 분석
  4.1 노무비 분석
  4.2 작업일보와 출역일보 분석
  4.3 노무계약 분석
  4.4 현행 TACT공정관리 한계
 5. 노무관리를 고려한 TACT공정관리 개선방안
 6. 결론
 참고문헌

저자정보

  • 김법수 Kim, Beop-Su. 충북대학교 건축공학과 석사과정
  • 박준모 Park, Jun-Mo. 충북대학교 건축공학과 박사수료
  • 강유미 Kang, Yu-Mi. 충북대학교 건축공학과 석사과정
  • 최병주 Choi, Byeong-Ju. 충북대학교 건축공학과 겸임교수, 공학박사