CBR 기반의 건설프로젝트 공사기간 추정시스템 개발

원문정보

Development of CBR-Based DEPOT(Duration Estimator for Project) System for Construction Project

이희덕, 이승훈, 서용칠, 이상범

피인용수 : 0(자료제공 : 네이버학술정보)

초록

영어

The estimation of construction duration is one of the most critical tasks in construction project planning, In the initial planning phase, however, estimating reliable project duration is an intractable problem. Since there are limited information and details in the preliminary planning, CBR(Case-Based Reasoning) can be considered as useful approach to solve this problem. Therefore this paper presents DEPOT(Duration Estimator for PrOjecT) as CBR-based construction duration estimating tool that is designed to estimate using available data at the early phase of project planning. DEPOT provides the similarity scatter diagram relating the similarity of past cases against the revised duration estimate and the list of similar cases to help retrieve a more optimal case for new construction project.

목차

Abstract
 1. 서론
  1.1 연구배경 및 목적
  1.2 연구범위 및 방법
 2. 예비적 고찰
  2.1 CBR
  2.2 공사기간 산정
 3. 시스템 개발
  3.1 시스템 개요
  3.2 기간추정 프로세스
  3.3 영향요인 설정
  3.4 속성유사도 측정
  3.5 가중치 설정
  3.6 사례유사도 측정
  3.7 기간보정
  3.8 유사도분포
  3.9 유사사례리스트
 4. 결론
 참고문헌

저자정보

  • 이희덕 Lee, Hei-Duck. (주)건원엔지니어링 기술연구소, 연구원, 공학석사
  • 이승훈 Lee, Seung-Hoon. (주)건원엔지니어링 기술연구소, 선임연구원, 공학박사
  • 서용칠 Seo, Yong-Chil. (주)건원엔지니어링 기술연구소, 연구소장, 공학박사
  • 이상범 Lee, Sang-Beom. 동의대학교 건축공학과 교수, 공학박사

참고문헌

자료제공 : 네이버학술정보

    함께 이용한 논문

      ※ 기관로그인 시 무료 이용이 가능합니다.

      • 4,000원

      0개의 논문이 장바구니에 담겼습니다.