It is expected that a substantial amount of spent fuels will be transported from the four nuclear power plant (NPP) sites in Korea to a hypothetical centralized interim storage facility or a final repository in the near future. The cost for the transportation is proportional to the amount of spent fuels. In this paper, a cost estimation program is developed based on the conceptual design of a transportation system and a logistics analysis. Using the developed computer program, named
as CASK, the minimum capacity of a centralized interim storage facility (CISF) and the ransportation cost for PWR spent fuels are calculated. The PWR spent fuels are transported from 4 NPP sites to a final repository (FR) via the CISF. Since NPP sites and the CISF are located along the coast, a sea-transportation is considered and a road-transportation is considered
between the CISF and the FR. The result shows that the minimum capacity of the interim storage facility is 15,000 MTU.
목차
2. PWR SPENT FUEL
3. TRANSPORTATION OF PWR SPENTFUEL
3.1 Mode and Route
3.2 Casks
3.3 Transportation Means
4. TRANSPORTATION SCENARIO
5. COST DETAIL
6. CONCLUSION AND DISCUSSION
ACKNOWLEDGEMENTS:
REFERENCES