A Study on the Application Methods of Historical Data Cost Method by Historical Data Analysis in Construction Cost
초록
영어
It used to the standard estimation for calculates order expectation cost but it uses phase actual construction cost which is improved and modified previous standard estimation in present. However, it would be difficult to assure the reliability of the historical cost data, if the historical cost information is not adjusted in an appropriate manner which consider time and capacity
of the historical projects.
Therefore, this study presents to analyze the present situation of integrated historical cost data system in domestic and various factors that affect price and to propriety the historical cost which is accumulated.
목차
1. 개요
1.1 연구의 배경과 목적
1.2 연구의 범위와 방법
2. 실적공사비 적산제도 현황
2.1 실적공사비 적산방식 개요
2.2 실적공사비의 가격산정방식
2.3 실적공사비 공사비구성 체계
3. 국내 실적공사비 단가 영향 요인 분석 및 단가보정기법 검토
3.1 건설공사비 단가 영향 요인 분석
3.2 건설공사비 단가 보정기법 검토
4. 공사수량에 대한 실적공사비 보정기준 방안
6. 결론
참고문헌