초록 열기/닫기 버튼


This research analyzes the design work and construction work, which might be arising out of or during the procurement process of naval ships of the Korean Navy. This research also suggests the applicable information methodology driven out by utilizing PLM/PDM tool, which could be one of practical solutions to the problems arising from the outcome of this analysis. As to the procedure and methodology of information technology of design and construction work of the ship, IPPD was adopted. Before its actual application, main contents of the IPPD were introduced in this research. And it's real application and subsequent concrete surroundings of IPDE were defined. In addition, several detailed and necessary works to be fulfilled were defined, mainly focused on the application of IPDD for the design and construction stages of the ships suitable for the Korean Navy. And also, this analysis defines the main functions to be secured by adopting the PLM/PDM tool and obtained the relevant functions partially herewith.